Apply roofing cement when installing drip edge on an existing roof.
Roof drip edge installation on existing roof.
If it doesn t pull the drip edge out slightly from under the shingles.
Place the metal roof drip edge flashing along the gable ends.
How to fix a roof drip edge installing roof drip edge flashing properly.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
Apply a continuous bead of cement along the top of the drip edge then press down on the shingle.
Lift the shingles slide the drip edge underneath them and position it so that it extends over the gutters then replace the shingles and push down to seat the drip edge.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
Overlap pieces at least a couple of inches shingle style with pieces higher up on the roof overlapping pieces lower.
Tip 2 is.
Ask this old house general contractor tom silva demonstrates the importance of a properly installed drip edge subscribe to this old house.
When lapping the eave metal overlap them so the seam faces away from the direction of prevailing view.
Coat the flat part of the flashing that sits on the deck using a putty knife.
Secure the drip edge with roofing cement.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
Make sure the outer edge extends over the gutter.
Three tips for overlapping drip edge flashing.
Save yourself some.
Install roof drip edge along the eaves add underlayment then place drip.