Paraguard expansion joint roof to roof with parasolo flashing.
Roof edge flashing detail.
Roof edge flashing 1 900 drip edge possibilities.
Wall base termination detail.
Mb bur 20 raised perimeter edge with metal cap fascia flashing detail.
The flashing shall be a minimum of 4 inches 102 mm high and 4 inches 102 mm wide.
Place the drip edge down aligning it so water will drip into the gutters.
68 profiles in over 40 colors quality edge s full line of drip edge or perimeter edge flashings provides the visual appeal homeowners are seeking and the performance sophisticated builders and contractors rely upon to protect roofs exposed edges and other areas exposed to the elements.
The flashing of the head of a batten seam roof at a wall is shown in this detail.
Details roofing wrb flashing.
Wall with self terminating parapro paraflex 531.
One common method is to lay the edge metal under the eaves membrane and over the rake.
Allow the epdm field membrane to pass over the edge by minimum 100 mm and fully adhere it to the front of the wood nailer over its full length.
Roof area divider curb type.
High wall flashing detail 10 wide sheets.
Use stainless steel screws to fasten the metal edge profile to the wood nailer at 100 mm on centre.
Because of the wide variation in detailing this section will not.
Protect the eave from ice dams and sideways rain step one in steep slope roofing is the edge flashing.
Paraguard expansion joint roof to wall with parasolo flashing.
Two ways to flash roof edges.
At the end of the vertical sidewall the step flashing shall be turned out in a manner that directs water away from the wall and onto the roof and or gutter while this is a nice diagram of how these flashings work don t forget our 5 th design rule.
Install a wood nailer at the roof edge.
208 termination bar roof edge detail fully adhered mechanically attached image vnd dwg download.
Roof edge details 9 1 general of all exterior building components roofs probably have the greatest exposure to environmental and physical abuse.
Wall flashing with coated metal edge.
Install drip edges on the eaves first.
A copper receiver holds the counterflashing at its top edge.
The top of the roof pan is formed into a bread pan whose upper edge is just above the finished batten.
Roof drip edge flashing serves multiple functions on a building the foremost of which is to assist water in leaving the roof edge with minimum damage to other building components by directing the water off of the roof and into the gutter.
Copper flashing is locked into this edge and extends at least 8 up the wall.
They must be carefully designed and installed to provide the appropriate performance and life expectancy.