Daily safety inspection report sample is an audit report which is obviously crucial for any company to track the health and well being of the employees.
Roof framing checklist.
Truss roof framing as per design.
Layout plans truss members connection schedule permanent bracing details dormers roof structures on manufacturer s drawings equipment appliances on man ufacturer s drawings location as per layout alignment bearing spacing connections to bearing points.
R802 3 notches on the ends of rafters don t exceed the nominal joist depth.
Roof sheathing is nailed every 6 in.
Determine if continuous headers are toe nailed to studs with 4 8d nails.
Along the edges and every 12 in.
Roof framing inspection checklist 1.
Approved documents which show.
Determine if studs are toe nailed to sole plates with at least 3 8d or 2 16d nails.
Wall framing inspection checklist continued m.
Get fix for any cut damaged joist or truss from joist or truss company.
R802 3 the rafters are framed opposite each other at the ridges.
Add studs under all double girder truss double joist.
Job address is posted in a visible location per irc section r319 1.
Inspect rafter materials and allowable spans r 802 1 r 802 5 tables r 802 5 1 1 r 802 5 1 8 a.
Determine how many rafters you ll need for the roof.
Roof must be complete before framing inspection.
Roof the ridges hips and valleys have shall be designed as beams for roof slopes 3 ft.
For all new construction.
The fields in the template include equipment standards of workers.
Permit residential framing checklist approved city stamped plans roof specifications and engineered floor system information is on site and accessible to inspector.
Building is safe and accessible.
For most load bearing requirements a roof truss will need to be placed every two feet along the walls.
The american plywood association says there s no reduction in strength for nails overdriven by 1 16in.
Toe nail rim board to sill plate at 6 on center.
2 bracing section 8 3 coupled roof connections ceiling joists to rafters collar ties to rafters 7 1 2 2 4 tie downs section 9 5 transfer of wall frame bracing 8 3 6 9 6 point loads including beams struts are adequately supported.
In high wind areas sheathing along the eaves rakes and ridges is nailed every 6 in.
Determine if double studs are face nailed with 10d nails at 24 in.