Additional construction details drawings.
Roof verge construction details.
Carry tiling battens over undercloak and finish 100mm from verge edge.
Cracking failure and close of cement verge fillets.
Wet rot to the roof batten ends.
Dry fix options for verges are also available from a number of manufacturers.
The trim and roofing sheet should be fastened every 12 to 24 inches along the gable edge.
Carry underlay 50mm onto outer leaf of gable wall.
The following conceptual details figures 9 1 to 9 6 show some of the typical conditions commonly encountered.
One pitched roof construction method is a cut roof method.
The sides of the tiles down the verge were traditionally cemented nowadays closing strips are available.
As well as the small selection of roof detail drawings shown here many of the building notes have a related construction detail drawing with specific dimensions eg rafter sizes spans insulations types for purchase with the building specifications.
To provide a drip edge allow an overhang of 1 to 2 inches at the eave.
The trim and roofing sheet should be fastened every 12 to 24 inches along the gable edge.
The edge of a pitched roof as it meets the gable end is called a verge.
At the gable edge use a gable or sidewall flashing.
Often the end tile of each row is mortared into place as shown below.
There are a couple of different methods for constructing pitched style roofs.
Fix standard tiles and tile and a half tiles in alternate courses.
This can be determined by the size of the timbers or the size of the roof.
At the gable edge use a gable or sidewall flashing.
Cad details document name pdf dwg download all cad construction details 37 1 mb 3 4 mb mc01 identification of roof areas 694 kb 167 kb mc01a single layer underlayment 678 kb 302 kb mc01b double layer underlayment 711 kb 322 kb mc02 vent pipe flashing 626 kb 349 kb mc03 valley.
Wind driven rain tends to only affect shallow pitch roofing and since this roof pitch was circa 45 degrees then we saw no need to spend money addressing a problem that didn t exist.
To provide a drip edge allow an overhang of 1 to 2 inches at the eave.
This will keep weather out prevent lifting in high winds and provide a neat finished appearance.
Bed an undercloak of plain tiles laid face down with bottom ends exposed projecting not more than 50mm beyond face of wall.
9 3 built up roofing because this is a wood detailing manual this section will only attempt to highlight some basic edge conditions that often adversely affect adjacent wood construction.
This will keep weather out prevent lifting in high winds and provide a neat fin ished appearance.
This is more of a traditional manner in regards to cutting the timber while onsite and building up the roof by the use of rafters ridge boards joists and purlins among others.
Verge the wall or rafter under the edge of a roof where it tops a gable end.