The drainage plane and drainage logic should encompass the entire building enclosure.
Roof drainage plan.
Roof plans a roof plan is used to show the shape of the roof.
Inspect the roof surface and roof drains on a regular schedule to find and clear away any debris clogging the drains.
Roof wall connections and roof dormer connections should be designed and constructed to shed or drain water to the exterior photograph 8.
Rain gutters are the most common drain system in use for all types of roofs.
Inspect the current roof drain s and the drain line through the building for leaks and assure that the materials are.
Developing the design criteria for a roof drainage plan that will perform with the roofing system to drain the roof is critical priorto the bid process and roof system installation.
Which method is used will depend on how the building is designed and or the type of public sewage system used in the area.
Deck balcony and railing connections should be designed and constructed to shed or drain water to the exterior.
Inexpensive gutters are the easiest types of drain systems to get and install.
A typical commercial or multifamily residential building will utilize one of the following types of primary roof drainage.
These will drain to somewhere near the center of the roof and down through the building to underground storm mains or a detention pond.
The design of the different drainage layers allows for a portion of the stormwater to be retained above where the water is allowed to flow freely off of the roof.
Can keep water from pooling and building up near the building foundation.
This form of roof drainage is preferred if a clean exterior appearance is desired.
Roof framing and drainage plans will be discussed in chapter 30.
Ipc provides four steps to size the roof drains on a building.
Garages decks and terraces should be sloped to the exterior and drained.
The most critical role of the drainage layer is to provide an adequate flow of water off the roof during and after rainfall.
Keeps water from pouring off of the roof in an uncontrollable manner.
Materials such as the roofing material vents and their location and the type of underlayment are also typically specified on the roof plan as seen in figure 20 3.
Water could then pour off overhanging roof eaves onto the ground below or in more sophisti cated assemblies flow toward the perimeter and into a clay wood or metal gutter system or through a drainage outlet in the exterior walls.
Roof drainage methods there are three basic methods covered in chapter 11 of the uniform plumbing code that are used to deal with stormwater that falls upon the roof or in and around a building.
Roof plans are typically drawn at.
For some types of roofs a roof drainage plan may also be drawn.
Historically roof drainage was ac complished by simply sloping the roof downward.
Protects doorways and window openings.